PROJECT BUILD

GenRight Fastback Roll Cage

6-Point Cage Install

Overview

GenRight Fastback roll cage. 6-point with integrated harness bar and gusseted A-pillar tie-ins. Built to survive the dumb ideas. This thing has already paid for itself multiple times.

Tools Needed

Materials Used

Estimated Time

Approximately 16-24 hours (including fitment, welding, and finishing).

Installation Steps

01

Remove Interior and Old Cage (if any)

Strip the interior, remove any existing cage or roll bar. Clean the tub thoroughly.

02

Fit the GenRight Fastback Cage

Position the 6-point cage in the tub. Align with A-pillar and B-pillar tie-ins. Clamp and check fitment.

03

Weld the Cage in Place

Tack weld first, check alignment, then fully weld the gussets and harness bar. Use proper technique for 1.75" DOM tubing.

04

Finish and Powdercoat

Grind welds smooth, clean the cage, and apply powdercoat or paint in semi-gloss black.

05

Reinstall Interior and Test

Reassemble seats, harnesses, and interior. Test for fit and rigidity.

Results

Solid 6-point GenRight Fastback cage providing excellent protection and a unique fastback profile. Ready for the trail.

Gallery
Before photo
Before photo
Cage fitment
GenRight fitment & clamps
Welding the cage
Welding 1.75" DOM
Cerecoated Burnt Bronze
Cerecoated Burnt Bronze
Cage installed
Fastback profile in
After cage complete
After - already paid for itself